PREPARE TO STOP AT INTERSECTION – LOOP 20-MCPHERSON RD. TRAFFIC SIGNAL WORK, SAT., APR. 13, 8A-5P
Written by Post Public Information Representative, Apr 10, 2013, 0 Comments
Traffic signal inoperable 8 a.m. to 5 p.m.
LAREDO, TX – On Saturday, April 13, 2013, the traveling public can expect a four-way stop condition and law enforcement assisted traffic control when approaching the Loop 20-McPherson Rd. intersection due to traffic signal controller box relocation work. As a result, this work will render traffic signal temporarily inoperable from 8 a.m. to 5 p.m. (CSJ: 0086-14-057)
SER Construction, Inc. will set up proper traffic control devices and place advance notices to the traveling public via portable message boards.
The Loop 20 West to East turnaround at McPherson Rd. will be closed April 10, 2013, and remain closed until the project is completed in late Fall 2013. (CSJ: 0086-14-057)
At all times, the traveling public should observe all advance warning signs, road markings and channelization devices in and around the work area while keeping a watchful eye for work crews.
Laredo Area Engineer Carlos G. Rodriguez, P.E. is in charge of this project.