IH 35 W. FRONTAGE ROAD MILL WORK & ASPHALT PAVING OPERATIONS
Written by Post Public Information Representative, Nov 5, 2012, 0 Comments
Alternating lane closures – Slow down and prepare to merge
LAREDO, TX – Effective Monday, November 05, 2012 between 9 p.m. and 6 a.m., Angel Brothers Enterprises will be performing roadway milling and asphalt paving operations on the IH 35 West Frontage Road beginning at Scott Street to 0.43 miles north of Shiloh. The project length is 5.743 miles long.
The traveling public should expect alternating lane closures. Motorists should slow down, prepare for merge, and drive with extreme caution while keeping a watchful eye for work crews.
At all times, the traveling public should all observe all advance warning signs, road markings and channelization devices in and around the work area.